Newmarket Subdivision – Erosion Control Installation
York Region, Ontario
MCBCMER installed approximately 300 metres of silt sock along the Newmarket Subdivision rail corridor to support Metrolinx’s environmental infrastructure upgrades. This work aimed to enhance erosion and sediment control in sensitive areas near creeks and wetlands.
Project Scope
Installed silt sock erosion control measures to stabilize slopes and protect adjacent natural features.