Newmarket Subdivision – Erosion Control Installation

York Region, Ontario

MCBCMER installed approximately 300 metres of silt sock along the Newmarket Subdivision rail corridor to support Metrolinx’s environmental infrastructure upgrades. This work aimed to enhance erosion and sediment control in sensitive areas near creeks and wetlands.

Project Scope

Installed silt sock erosion control measures to stabilize slopes and protect adjacent natural features.

Key Services

Erosion and sediment control
Slope stabilization
Environmental protection

Key Challenges

Sensitive natural habitat requiring minimal disturbance
Delivering work efficiently within an active transit corridor

Project Solutions

Used low-impact installation methods to reduce disruption to wetlands
Used low-impact installation methods to reduce disruption to wetlands